ITAC Assessment: WM0136
ITAC logo
ITAC Assessment: WM0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Printed Circuit Board Assemblies
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 22,280
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,351 825,600
kWh
Electricity Demand $14,399 1,986
kW-mo/yr
Electricity Fees $(-3,487.0) -
Natural Gas $4,163 595
MMBtu
Waste Disposal Costs
Water Usage $8,171 209
Tgal
TOTAL YEARLY COSTS $92,597
RECOMMENDED SAVINGS* $32,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $23,987 $106,000 $23,987
285,565
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,803 $4,811 $3,730
44,410
kWh
$1,073
-
kW-mo/yr
-
03 2.7313: Recycle air for heating, ventilation and air conditioning $1,529 $1,319 $1,187
14,135
kWh
$341
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $854 $1,600 $663
7,896
kWh
$191
-
kW-mo/yr
-
05 2.7224: Reduce space conditioning during non-working hours $692 - - - $692
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $549 - $387
4,599
kWh
$162
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,414 $113,730 $29,955
356,605
kWh
$1,768
-
kW-mo/yr
$692
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs