| Assessment Year | 1992 |
|---|---|
| Principal Product | DAMPERS, LOUVERS |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $10 M to 50M |
| # of Employees | 212 |
| Plant Area |
n/a
|
| Annual Production | 504,400
pieces
|
| Production Hrs. Annual | 3,825
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $77,401 | 1,554,220 |
kWh
|
$0.050 |
| Natural Gas | $40,680 | 9,154 |
MMBtu
|
$4.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,163 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,780 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,723 | $850 |
$3,723
74,736
kWh
|
- | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $1,986 | $300 |
$1,986
39,859
kWh
|
- | - | |
| 03 | 2.2511: Insulate bare equipment | $1,732 | $4,032 | - |
$1,732
-
MMBtu
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,300 | $949 |
$234
4,689
kWh
|
$1,066
-
MMBtu
|
- | |
| 05 | 2.6232: Install set-back timers | $365 | $760 |
$365
7,327
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $57 | - |
$102
2,052
kWh
|
- | $(-45.0) | |
| TOTAL RECOMMENDED | $9,163 | $6,891 |
$6,410
128,663
kWh
|
$2,798
-
MMBtu
|
$(-45.0) | ||
| TOTAL IMPLEMENTED | $3,780 | $850 |
$3,825
76,788
kWh
|
- | $(-45.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs