ITAC Assessment: KU0371
ITAC logo
ITAC Assessment: KU0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DAMPERS, LOUVERS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 212
Plant Area
n/a
Annual Production 504,400
pieces
Production Hrs. Annual 3,825
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,401 1,554,220
kWh
Natural Gas $40,680 9,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,723 $850 $3,723
74,736
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $1,986 $300 $1,986
39,859
kWh
- -
03 2.2511: Insulate bare equipment $1,732 $4,032 - $1,732
-
MMBtu
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,300 $949 $234
4,689
kWh
$1,066
-
MMBtu
-
05 2.6232: Install set-back timers $365 $760 $365
7,327
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $57 - $102
2,052
kWh
- $(-45.0)
TOTAL RECOMMENDED $9,163 $6,891 $6,410
128,663
kWh
$2,798
-
MMBtu
$(-45.0)
TOTAL IMPLEMENTED $3,780 $850 $3,825
76,788
kWh
- $(-45.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs