ITAC Assessment: NT0023
ITAC logo
ITAC Assessment: NT0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Corrugated and soid fiber boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 183
Plant Area 190,000
ft2
Annual Production 103,166,480
units
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,747 6,278,052
kWh
Electricity Demand $168,715 14,047
kW-mo/yr
Electricity Fees $8,364 -
Natural Gas $74,026 51,443
MMBtu
Waste Disposal Costs
Water Usage $44,982 6,260
Tgal
TOTAL YEARLY COSTS $691,834
RECOMMENDED SAVINGS* $219,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,070 $5,609 $783
12,424
kWh
$287
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,899 $15,284 $16,025
254,359
kWh
$5,875
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $36,182 $16,564 - $36,182
-
kW-mo/yr
- -
04 4.812: Apply for investment incentives $7,720 - - - $7,720 -
05 2.7232: Replace existing hvac unit with high efficiency model $2,130 $17,836 $2,130
33,814
kWh
- - -
06 4.632: Change operating conditions $150,000 $616,838 - - - $150,000
TOTAL RECOMMENDED $219,000 $672,131 $18,938
300,596
kWh
$42,343
-
kW-mo/yr
$7,720 $150,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs