| Assessment Year | 2016 |
|---|---|
| Principal Product | Security Glass |
| NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
| SIC | 3231: Glass Products, Made of Purchased Glass |
| Sales Range | $10 M to 50M |
| # of Employees | 113 |
| Plant Area |
180,000
ft2
|
| Annual Production | 550,000
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $397,953 | 4,946,860 |
kWh
|
$0.080 |
| Electricity Fees | $31,345 | - |
|
- |
| Natural Gas | $9,380 | 1,030 |
MMBtu
|
$9.11 |
| TOTAL YEARLY COSTS | $438,678 | |||
| RECOMMENDED SAVINGS* | $69,148 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,259 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $40,043 | $13,993 |
$38,481
478,326
kWh
|
$1,562 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,349 | $27,272 |
$9,945
123,622
kWh
|
$404 | |
| 03 | 2.6218: Turn off equipment when not in use | $7,746 | - |
$7,444
92,532
kWh
|
$302 | |
| 04 | 2.4323: Use optimum size and capacity equipment | $5,881 | $7,219 |
$5,652
70,261
kWh
|
$229 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,533 | $1,115 |
$3,395
42,205
kWh
|
$138 | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,100 | $350 |
$1,057
13,135
kWh
|
$43 | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $496 | $870 |
$477
5,923
kWh
|
$19 | |
| TOTAL RECOMMENDED | $69,148 | $50,819 |
$66,451
826,004
kWh
|
$2,697 | ||
| TOTAL IMPLEMENTED | $20,259 | $36,476 |
$19,469
242,011
kWh
|
$790 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs