ITAC Assessment: WV0644
ITAC logo
ITAC Assessment: WV0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Custom Cabinetry
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 970,000
ft2
Annual Production 5,100
pieces
Production Hrs. Annual 4,590
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,475 834,390
kWh
Electricity Demand $42,141 2,857
kW-mo/yr
Electricity Fees $3,640 -
LPG $54,405 2,647
MMBtu
Waste Disposal Costs
Water Usage $1,493 145
Tgal
Water Disposal $977 145
Tgal
TOTAL YEARLY COSTS $145,131
RECOMMENDED SAVINGS* $41,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $23,558 $12,360 $13,779
254,701
kWh
$9,779
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,092 $29,560 $556
10,272
kWh
$398
-
kW-mo/yr
$5,138
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,500 $1,023 - - $4,500
-
MMBtu
-
04 2.2449: Recover heat from exhausted steam, hot air or hot water $4,007 $10,420 - - $4,007
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $954 $1,965 $836
15,462
kWh
$118
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $530 $100 $309
5,707
kWh
$221
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $523 $1,573 $269
4,964
kWh
$192
-
kW-mo/yr
$62
-
MMBtu
-
08 2.4239: Eliminate or reduce compressed air usage $459 $1,293 $263
4,864
kWh
$196
-
kW-mo/yr
- -
09 2.4151: Develop a repair/replace policy $310 $592 $200
3,695
kWh
$148
-
kW-mo/yr
- $(-38.0)
10 2.6231: Utilize controls to operate equipment only when needed $76 $368 $46
841
kWh
$30
-
kW-mo/yr
- -
11 2.2511: Insulate bare equipment $21 $31 - - $21
-
MMBtu
-
TOTAL RECOMMENDED $41,030 $59,285 $16,258
300,506
kWh
$11,082
-
kW-mo/yr
$13,728
-
MMBtu
$(-38.0)
TOTAL IMPLEMENTED $7,373 $6,945 $1,923
35,533
kWh
$905
-
kW-mo/yr
$4,583
-
MMBtu
$(-38.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs