ITAC Assessment: MI0160
ITAC logo
ITAC Assessment: MI0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product spices and soup mixes
NAICS 311942: Spice and Extract Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 120,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $456,615 3,302,640
kWh
Electricity Demand $51,378 6,606
kW-mo/yr
Electricity Fees $6,753 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,966

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,466 $1,032 $18,959
137,126
kWh
$1,507
-
kW-mo/yr
02 2.4323: Use optimum size and capacity equipment $22,048 $8,641 $20,165
145,806
kWh
$1,883
-
kW-mo/yr
03 2.7446: Utilize sensors controlling roof and wall openings $16,476 $474 $15,029
130,456
kWh
$1,447
-
kW-mo/yr
04 2.2628: Utilize a less expensive cooling method $11,340 $15,475 $9,971
75,100
kWh
$1,369
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,705 $17,226 $6,423
46,455
kWh
$1,282
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,319 $24 $5,806
41,993
kWh
$513
-
kW-mo/yr
07 2.4323: Use optimum size and capacity equipment $5,440 $3,411 $5,101
36,897
kWh
$339
-
kW-mo/yr
TOTAL RECOMMENDED $89,794 $46,283 $81,454
613,833
kWh
$8,340
-
kW-mo/yr
TOTAL IMPLEMENTED $50,966 $18,756 $46,217
356,030
kWh
$4,749
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs