ITAC Assessment: WV0623
ITAC logo
ITAC Assessment: WV0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Construction Equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 800,000
ft2
Annual Production 1,500
units
Production Hrs. Annual 2,880
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,094 6,087,333
kWh
Electricity Demand $208,747 22,228
kW-mo/yr
Electricity Fees $11,938 -
Natural Gas $286,598 26,180
MMBtu
Waste Disposal Costs
Water Usage $111,002 7,255
Tgal
TOTAL YEARLY COSTS $884,379
RECOMMENDED SAVINGS* $277,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $196,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $72,629 $104,885 $38,224
874,693
kWh
$34,405
-
kW-mo/yr
- - -
02 2.7232: Replace existing hvac unit with high efficiency model $61,441 $127,733 $1,899
43,453
kWh
$554
-
kW-mo/yr
$58,988
-
MMBtu
- -
03 2.4322: Use or replace with energy efficient substitutes $51,704 $257,600 $27,281
624,270
kWh
$24,423
-
kW-mo/yr
- - -
04 3.5131: Recycle white water $19,492 $11,082 $(-172.0)
(-3,944)
kWh
- - $19,664
-
Tgal
-
05 2.1321: Replace fossil fuel equipment with electrical equipment $19,461 $91,800 $(-8,178.0)
(-187,129)
kWh
$(-7,324.0)
-
kW-mo/yr
$34,963
-
MMBtu
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,348 $3,600 - $14,348
-
kW-mo/yr
- - -
07 2.7313: Recycle air for heating, ventilation and air conditioning $12,693 $51,500 $2,570
58,800
kWh
$2,301
-
kW-mo/yr
$28,350
-
MMBtu
- $(-20,528.0)
08 2.7314: Reduce ventilation air $8,396 $19,558 $90
2,058
kWh
$28
-
kW-mo/yr
$8,278
-
MMBtu
- -
09 2.2426: Use waste heat from flue gases to heat space conditioning air $6,154 $13,600 - - $6,154
-
MMBtu
- -
10 2.4239: Eliminate or reduce compressed air usage $2,877 $2,813 $1,515
34,680
kWh
$1,362
-
kW-mo/yr
- - -
11 2.4224: Upgrade controls on compressors $1,756 $299 $1,756
40,188
kWh
- - - -
12 2.1233: Analyze flue gas for proper air/fuel ratio $1,660 $3,000 - - $1,960
-
MMBtu
- $(-300.0)
13 2.4231: Reduce the pressure of compressed air to the minimum required $1,487 $990 $1,040
23,800
kWh
$447
-
kW-mo/yr
- - -
14 2.4151: Develop a repair/replace policy $1,356 $2,300 $845
19,349
kWh
$751
-
kW-mo/yr
- - $(-240.0)
15 2.4224: Upgrade controls on compressors $1,341 $4,835 $900
20,598
kWh
$441
-
kW-mo/yr
- - -
16 2.4157: Establish a predictive maintenance program $313 $1,500 $1,203
27,518
kWh
$1,080
-
kW-mo/yr
- - $(-1,970.0)
TOTAL RECOMMENDED $277,108 $697,095 $68,973
1,578,334
kWh
$72,816
-
kW-mo/yr
$138,693
-
MMBtu
$19,664
-
Tgal
$(-23,038.0)
TOTAL IMPLEMENTED $196,251 $504,455 $73,460
1,681,031
kWh
$62,383
-
kW-mo/yr
$60,948
-
MMBtu
- $(-540.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs