ITAC Assessment: GT0234
ITAC logo
ITAC Assessment: GT0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product AIRCRAFT COMPONENTS
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 78
Plant Area
n/a
Annual Production 240,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,234 2,296,893
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,793

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $26,550 $30,000 $26,550
-
kWh
02 2.4133: Use most efficient type of electric motors $243 $386 $243
3,810
kWh
03 2.7251: Reduce air conditioning load by evaporating water from roof $6,500 $20,000 $6,500
102,579
kWh
TOTAL RECOMMENDED $33,293 $50,386 $33,293
106,389
kWh
TOTAL IMPLEMENTED $26,793 $30,386 $26,793
3,810
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs