Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Motor oil/lubricants
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $1
M
to 5
M
# of Employees 33
Plant Area 72,000
ft2
Annual Production 19,500
Tgal
Production Hrs. Annual 3,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,072 1,388,274
kWh
Electricity Demand $48,183 4,966
kW-mo/yr
Electricity Fees $28,989 -
Natural Gas $129,014 35,553
MMBtu
Waste Disposal Costs
Water Usage $12,678 305
Tgal
TOTAL YEARLY COSTS $304,936
RECOMMENDED SAVINGS* $22,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,495

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $9,402 $20,461 $5,920
93,232
kWh
$3,482
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $5,152 $23,536 $(-101.0)
(-1,586)
kWh
- $5,253
-
MMBtu
-
03 2.4224: Upgrade controls on compressors $2,898 $11,215 $2,151
33,879
kWh
$747
-
kW-mo/yr
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,610 $3,100 - - $2,610
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $898 $300 $568
8,944
kWh
$330
-
kW-mo/yr
- -
06 2.4322: Use or replace with energy efficient substitutes $707 $2,525 $445
7,003
kWh
$262
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $656 $2,840 - - $656
-
MMBtu
-
08 2.4239: Eliminate or reduce compressed air usage $372 $340 $236
3,713
kWh
$136
-
kW-mo/yr
- -
09 2.4151: Develop a repair/replace policy $252 $667 $348
5,479
kWh
$204
-
kW-mo/yr
- $(-300.0)
TOTAL RECOMMENDED $22,947 $64,984 $9,567
150,664
kWh
$5,161
-
kW-mo/yr
$8,519
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $5,495 $9,772 $1,597
25,139
kWh
$932
-
kW-mo/yr
$3,266
-
MMBtu
$(-300.0)