Assessment Year | 2022 |
---|---|
Principal Product | High voltage switch |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 344 |
Plant Area |
217,000
ft2
|
Annual Production | 750,000
units
|
Production Hrs. Annual | 4,654
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $128,256 | 1,891,973 |
kWh
|
$0.068 | |
Electricity Demand | $20,597 | 7,330 |
kW-mo/yr
|
$2.81 | |
Electricity Fees | $(-14,232.0) | - |
|
- | |
Natural Gas | $25,801 | 1,619 |
MMBtu
|
$15.94 | |
Waste Disposal Costs | |||||
Water Usage | $7,489 | 692,252 |
Tgal
|
$0.011 | |
Water Disposal | $8,802 | 695,500 |
Tgal
|
$0.013 | |
TOTAL YEARLY COSTS | $176,713 | ||||
RECOMMENDED SAVINGS* | $53,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $23,695 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $12,269 | $21,859 |
$10,614
156,549
kWh
|
$1,655
-
kW-mo/yr
|
- | - | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $9,862 | $48,343 |
$(-14,320.0)
(-211,204)
kWh
|
$(-812.0)
-
kW-mo/yr
|
- |
$24,994
-
MMBtu
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,354 | $20,540 |
$308
4,546
kWh
|
$37
-
kW-mo/yr
|
- |
$7,009
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,686 | $23,557 |
$5,627
83,001
kWh
|
$1,059
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,366 | $465 |
$5,751
84,818
kWh
|
$615
-
kW-mo/yr
|
- | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $3,888 | $18,000 |
$3,511
51,791
kWh
|
$377
-
kW-mo/yr
|
- | - | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $2,302 | $2,408 |
$2,080
30,680
kWh
|
$222
-
kW-mo/yr
|
- | - | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,675 | $3,980 | - |
$1,675
-
kW-mo/yr
|
- | - | - | |
09 | 2.4224: Upgrade controls on compressors | $1,010 | $4,122 |
$869
12,823
kWh
|
$141
-
kW-mo/yr
|
- | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $601 | $98 |
$542
7,989
kWh
|
$59
-
kW-mo/yr
|
- | - | - | |
11 | 2.3212: Optimize plant power factor | $596 | $2,747 | - | - | $596 | - | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $582 | $1,321 |
$491
7,244
kWh
|
$54
-
kW-mo/yr
|
- |
$37
-
MMBtu
|
- | |
13 | 2.4151: Develop a repair/replace policy | $412 | $1,761 |
$639
9,419
kWh
|
$67
-
kW-mo/yr
|
- | - | $(-294.0) | |
14 | 2.2511: Insulate bare equipment | $139 | $325 |
$139
2,051
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $53,742 | $149,526 |
$16,251
239,707
kWh
|
$5,149
-
kW-mo/yr
|
$596 |
$32,040
-
MMBtu
|
$(-294.0) | ||
TOTAL IMPLEMENTED | $23,695 | $33,785 |
$20,634
304,329
kWh
|
$2,759
-
kW-mo/yr
|
$596 | - | $(-294.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs