ITAC Assessment: WV0608
ITAC logo
ITAC Assessment: WV0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product OEM Mining Equipment
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 29
Plant Area 170,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 5,200
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,932 1,623,520
kWh
Electricity Demand $16,317 1,547
kW-mo/yr
Electricity Fees $4,532 -
Natural Gas $23,641 2,795
MMBtu
TOTAL YEARLY COSTS $184,422
RECOMMENDED SAVINGS* $46,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4224: Upgrade controls on compressors $32,464 $14,300 $27,805
322,194
kWh
$4,659
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,495 $38,306 $7,195
83,465
kWh
$2,300
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,836 $1,100 $2,425
28,134
kWh
$411
-
kW-mo/yr
-
04 2.3132: Recharge batteries on during off-peak demand periods $952 - - $2,152
-
kW-mo/yr
$(-1,200.0)
05 2.4151: Develop a repair/replace policy $746 $300 $977
11,333
kWh
$169
-
kW-mo/yr
$(-400.0)
TOTAL RECOMMENDED $46,493 $54,006 $38,402
445,126
kWh
$9,691
-
kW-mo/yr
$(-1,600.0)
TOTAL IMPLEMENTED $4,534 $1,400 $3,402
39,467
kWh
$2,732
-
kW-mo/yr
$(-1,600.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs