ITAC Assessment: IA0052
ITAC logo
ITAC Assessment: IA0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product tool storage chest
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,509 6,636,577
kWh
Natural Gas $122,935 43,826
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6121: Reduce hot water temperature to the minimum required $19,340 $50,000 $886
20,516
kWh
$18,454
-
MMBtu
02 2.7314: Reduce ventilation air $8,534 $30,000 $(-2,692.0)
(-62,134)
kWh
$11,226
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $5,141 $100 $5,141
118,699
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,145 $240 $3,145
72,685
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,470 $200 $1,470
33,998
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,629 $518 $4,629
106,975
kWh
-
07 2.7135: Install occupancy sensors $2,044 $2,646 $2,044
47,186
kWh
-
08 2.7111: Reduce illumination to minimum necessary levels $891 $720 $891
20,516
kWh
-
TOTAL RECOMMENDED $45,194 $84,424 $15,514
358,441
kWh
$29,680
-
MMBtu
TOTAL IMPLEMENTED $6,673 $3,164 $6,673
154,161
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs