ITAC Assessment: WV0589
ITAC logo
ITAC Assessment: WV0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Plastic Manifolds and Paper Filter
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 410
Plant Area 205,000
ft2
Annual Production 23,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,543 10,482,330
kWh
Electricity Demand $159,388 39,086
kW-mo/yr
Electricity Fees $27,038 -
Natural Gas $44,076 7,770
MMBtu
Waste Disposal Costs
Water Usage $3,762 452
Tgal
Water Disposal $3,099 452
Tgal
TOTAL YEARLY COSTS $748,906
RECOMMENDED SAVINGS* $124,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,897 $154,350 $30,897
633,139
kWh
- - - - - -
02 2.7241: Install outside air damper / economizer on hvac unit $22,091 $28,000 $22,091
452,685
kWh
- - - - - -
03 2.7135: Install occupancy sensors $19,827 $15,605 $17,346
355,454
kWh
$2,481
-
kW-mo/yr
- - - - -
04 2.6231: Utilize controls to operate equipment only when needed $14,254 $12,580 - - - $14,254
-
MMBtu
- - -
05 2.3212: Optimize plant power factor $10,950 $36,000 - - $10,950 - - - -
06 2.4224: Upgrade controls on compressors $10,700 $5,225 $9,427
193,167
kWh
$1,273
-
kW-mo/yr
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,413 $2,438 $6,413
131,420
kWh
- - - - - -
08 2.4151: Develop a repair/replace policy $2,587 $575 $2,707
55,469
kWh
- - - - - $(-120.0)
09 3.4151: Minimize water usage $2,004 $3,500 - - - - $1,244
-
Tgal
$1,025
-
Tgal
$(-265.0)
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,730 $1,251 $1,550
31,760
kWh
$180
-
kW-mo/yr
- - - - -
11 2.2511: Insulate bare equipment $1,270 $427 $824
16,877
kWh
$94
-
kW-mo/yr
- $352
-
MMBtu
- - -
12 2.4231: Reduce the pressure of compressed air to the minimum required $1,181 $75 $1,059
21,700
kWh
$122
-
kW-mo/yr
- - - - -
13 2.1233: Analyze flue gas for proper air/fuel ratio $777 $2,500 - - - $845
-
MMBtu
- - $(-68.0)
TOTAL RECOMMENDED $124,681 $262,526 $92,314
1,891,671
kWh
$4,150
-
kW-mo/yr
$10,950 $15,451
-
MMBtu
$1,244
-
Tgal
$1,025
-
Tgal
$(-453.0)
TOTAL IMPLEMENTED $76,749 $89,596 $61,417
1,258,532
kWh
$4,150
-
kW-mo/yr
$10,950 $352
-
MMBtu
- - $(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs