ITAC Assessment: SU0110
ITAC logo
ITAC Assessment: SU0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Ceramic Dinnerware
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 660,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $378,388 13,708,963
kWh
Electricity Demand $336,830 31,204
kW-mo/yr
Electricity Fees $51,608 -
Natural Gas $1,710,849 422,656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
01 2.8112: Combine utility meters $5,085 - - - $5,085 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $13,180 $2,241 $13,180
183,763
kWh
- - -
03 3.4151: Minimize water usage $51,680 $1,605 - - - $51,680
-
Tgal
04 2.7111: Reduce illumination to minimum necessary levels $2,023 $90 $1,257
41,911
kWh
$766
-
kW-mo/yr
- -
05 2.7122: Disconnect ballasts $65 - $22
879
kWh
$43
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $1,526 $3,780 - - $1,526 -
TOTAL RECOMMENDED $73,559 $7,716 $14,459
226,553
kWh
$809
-
kW-mo/yr
$6,611 $51,680
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs