Assessment Year | 2019 |
---|---|
Principal Product | Automation equipment |
NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
105,419
ft2
|
Annual Production | 5,600,000
lb
|
Production Hrs. Annual | 4,836
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $73,484 | 1,041,800 |
kWh
|
$0.071 | |
Electricity Demand | $53,670 | 3,258 |
kW-mo/yr
|
$16.47 | |
Electricity Fees | $945 | - |
|
- | |
Natural Gas | $48,812 | 4,387 |
MMBtu
|
$11.13 | |
Waste Disposal Costs | |||||
Water Usage | $972 | 250 |
Tgal
|
$3.89 | |
Water Disposal | $1,044 | 250 |
Tgal
|
$4.18 | |
TOTAL YEARLY COSTS | $178,927 | ||||
RECOMMENDED SAVINGS* | $15,718 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $5,080 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $6,365 | $5,150 |
$(-646.0)
9,168
kWh
|
$(-379.0)
-
kW-mo/yr
|
$7,390
-
MMBtu
|
- | - | - | |
02 | 2.4224: Upgrade controls on compressors | $2,374 | $8,525 |
$1,501
21,296
kWh
|
$873
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,872 | $896 |
$1,180
16,731
kWh
|
$692
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.6232: Install set-back timers | $1,692 | $105 | - | - |
$1,692
-
MMBtu
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $940 | $70 |
$594
8,421
kWh
|
$346
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $715 | $1,275 |
$715
10,140
kWh
|
- | - | - | - | - | |
07 | 3.5131: Recycle white water | $674 | $2,000 | - | - | - |
$325
-
Tgal
|
$349
-
Tgal
|
- | |
08 | 2.4151: Develop a repair/replace policy | $576 | $558 |
$461
6,539
kWh
|
$395
-
kW-mo/yr
|
- | - | - | $(-280.0) | |
09 | 3.4151: Minimize water usage | $510 | $1,400 | - | - | - |
$311
-
Tgal
|
$334
-
Tgal
|
$(-135.0) | |
TOTAL RECOMMENDED | $15,718 | $19,979 |
$3,805
72,295
kWh
|
$1,927
-
kW-mo/yr
|
$9,082
-
MMBtu
|
$636
-
Tgal
|
$683
-
Tgal
|
$(-415.0) | ||
TOTAL IMPLEMENTED | $5,080 | $1,629 |
$2,235
31,691
kWh
|
$1,433
-
kW-mo/yr
|
$1,692
-
MMBtu
|
- | - | $(-280.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs