ITAC Assessment: WV0575
ITAC logo
ITAC Assessment: WV0575
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automation equipment
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 105,419
ft2
Annual Production 5,600,000
lb
Production Hrs. Annual 4,836
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,484 1,041,800
kWh
Electricity Demand $53,670 3,258
kW-mo/yr
Electricity Fees $945 -
Natural Gas $48,812 4,387
MMBtu
Waste Disposal Costs
Water Usage $972 250
Tgal
Water Disposal $1,044 250
Tgal
TOTAL YEARLY COSTS $178,927
RECOMMENDED SAVINGS* $15,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.6231: Utilize controls to operate equipment only when needed $6,365 $5,150 $(-646.0)
9,168
kWh
$(-379.0)
-
kW-mo/yr
$7,390
-
MMBtu
- - -
02 2.4224: Upgrade controls on compressors $2,374 $8,525 $1,501
21,296
kWh
$873
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,872 $896 $1,180
16,731
kWh
$692
-
kW-mo/yr
- - - -
04 2.6232: Install set-back timers $1,692 $105 - - $1,692
-
MMBtu
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $940 $70 $594
8,421
kWh
$346
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $715 $1,275 $715
10,140
kWh
- - - - -
07 3.5131: Recycle white water $674 $2,000 - - - $325
-
Tgal
$349
-
Tgal
-
08 2.4151: Develop a repair/replace policy $576 $558 $461
6,539
kWh
$395
-
kW-mo/yr
- - - $(-280.0)
09 3.4151: Minimize water usage $510 $1,400 - - - $311
-
Tgal
$334
-
Tgal
$(-135.0)
TOTAL RECOMMENDED $15,718 $19,979 $3,805
72,295
kWh
$1,927
-
kW-mo/yr
$9,082
-
MMBtu
$636
-
Tgal
$683
-
Tgal
$(-415.0)
TOTAL IMPLEMENTED $5,080 $1,629 $2,235
31,691
kWh
$1,433
-
kW-mo/yr
$1,692
-
MMBtu
- - $(-280.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs