ITAC Assessment: WV0545
ITAC logo
ITAC Assessment: WV0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product press molded plastic
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 122,000
ft2
Annual Production 300,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,302 945,000
kWh
Electricity Demand $37,592 4,823
kW-mo/yr
Natural Gas $18,587 3,105
MMBtu
Waste Disposal Costs
Water Usage $30 30,420
Tgal
Water Disposal $67 30
Tgal
TOTAL YEARLY COSTS $131,578
RECOMMENDED SAVINGS* $26,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $7,127 $2,800 - - - - - - $7,127
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,951 $490 $3,822
47,960
kWh
$2,129
-
kW-mo/yr
- - - - -
03 2.6232: Install set-back timers $4,904 $1,700 - - $4,904
-
MMBtu
- - - -
04 2.4157: Establish a predictive maintenance program $2,998 $1,000 $2,759
34,617
kWh
$1,466
-
kW-mo/yr
- - - $(-1,227.0) -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,500 $4,023 $1,001
12,562
kWh
$499
-
kW-mo/yr
- - - - -
06 2.2531: Re-size charging openings or add movable cover or door $1,459 $1,400 - - $1,459
-
MMBtu
- - - -
07 2.4239: Eliminate or reduce compressed air usage $943 $500 $615
7,722
kWh
$328
-
kW-mo/yr
- - - - -
08 2.4151: Develop a repair/replace policy $516 $568 $466
5,842
kWh
$250
-
kW-mo/yr
- - - $(-200.0) -
09 2.2511: Insulate bare equipment $468 $156 $304
3,809
kWh
$164
-
kW-mo/yr
- - - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $268 $20 $174
2,179
kWh
$94
-
kW-mo/yr
- - - - -
11 3.4151: Minimize water usage $65 $300 - - - $30
-
Tgal
$67
-
Tgal
- $(-32.0)
12 2.7447: Install vinyl strip / high speed / air curtain doors $60 $128 - - $60
-
MMBtu
- - - -
TOTAL RECOMMENDED $26,259 $13,085 $9,141
114,691
kWh
$4,930
-
kW-mo/yr
$6,423
-
MMBtu
$30
-
Tgal
$67
-
Tgal
$(-1,427.0) $7,095
TOTAL IMPLEMENTED $20,266 $9,601 $5,463
68,543
kWh
$2,972
-
kW-mo/yr
$4,904
-
MMBtu
- - $(-200.0) $7,127
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs