ITAC Assessment: TN0693
ITAC logo
ITAC Assessment: TN0693
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product lawn mowers
NAICS
n/a
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $100
M
to 500
M
# of Employees 360
Plant Area 160,000
ft2
Annual Production 440,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,135 4,081,477
kWh
Electricity Demand $80,353 10,000
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.421: Modify current incentive program $77,500 $35,600 - - - $77,500
02 3.5316: Contract a wood pallet recycling company $69,815 $1,200 - - $69,815
-
lb
-
03 2.2691: Shut off cooling if cold outside air will cool process $22,100 $8,120 $22,100
404,748
kWh
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $12,000 $35,070 $12,000
319,168
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $11,176 $379 $7,287
227,726
kWh
$3,889
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,508 $18,900 - $8,508
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,503 $900 $816
25,498
kWh
$687
-
kW-mo/yr
- -
08 2.4226: Use / purchase optimum sized compressor $2,357 $490 $1,435
44,842
kWh
$922
-
kW-mo/yr
- -
09 3.5311: Recover and reuse waste material $750 $570 - - $750
-
lb
-
TOTAL RECOMMENDED $205,709 $101,229 $43,638
1,021,982
kWh
$14,006
-
kW-mo/yr
$70,565
-
lb
$77,500
TOTAL IMPLEMENTED $106,272 $44,880 $35,535
768,758
kWh
$922
-
kW-mo/yr
$69,815
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs