| Assessment Year | 1991 |
|---|---|
| Principal Product | CAKES AND COOKIES |
| NAICS |
n/a
|
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
n/a
|
| Annual Production | 1,720,000
pieces
|
| Production Hrs. Annual | 2,498
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $109,345 | 1,521,981 |
kWh
|
$0.072 |
| Natural Gas | $41,270 | 10,318 |
MMBtu
|
$4.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,052 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,052 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,450 | - |
$8,450
-
kWh
|
- | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $2,770 | $710 |
$2,770
87,339
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $517 | $95 |
$517
6,155
kWh
|
- | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $725 | - |
$1,790
34,291
kWh
|
$(-1,065.0)
-
MMBtu
|
|
| 05 | 2.7261: Install timers and/or thermostats | $770 | $320 |
$220
7,034
kWh
|
$550
-
MMBtu
|
|
| 06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $410 | $910 | - |
$410
-
MMBtu
|
|
| 07 | 2.8123: Pay utility bills on time | $225 | - |
$225
-
kWh
|
- | |
| 08 | 2.6232: Install set-back timers | $185 | - |
$185
3,224
kWh
|
- | |
| TOTAL RECOMMENDED | $14,052 | $2,035 |
$14,157
138,043
kWh
|
$(-105.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,052 | $2,035 |
$14,157
138,043
kWh
|
$(-105.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs