ITAC Assessment: LE0415
ITAC logo
ITAC Assessment: LE0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Welding and Fabrication
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 500,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $372,365 4,956,087
kWh
Electricity Demand $37,467 17,615
kW-mo/yr
Electricity Fees $15,918 -
Natural Gas $107,972 11,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $160,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $958 $25 $826
11,012
kWh
$132
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,614 $1,000 $4,408
58,770
kWh
$207
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $383 $350 $344
4,591
kWh
$38
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $105,231 $98,175 $100,036
1,333,812
kWh
$5,195
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,400 $15,000 $15,400
204,896
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,836 $35,700 $28,701
382,678
kWh
$3,135
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,163 $8,300 $5,556
74,076
kWh
$607
-
kW-mo/yr
08 2.7131: Add area lighting switches $4,550 $12,000 $4,550
60,678
kWh
-
09 2.4226: Use / purchase optimum sized compressor $17,395 $67,000 $16,639
221,852
kWh
$756
-
kW-mo/yr
10 2.7232: Replace existing hvac unit with high efficiency model $1,733 $7,800 $1,712
22,822
kWh
$21
-
kW-mo/yr
TOTAL RECOMMENDED $188,263 $245,350 $178,171
2,375,187
kWh
$10,092
-
kW-mo/yr
TOTAL IMPLEMENTED $160,035 $201,900 $150,609
2,008,124
kWh
$9,425
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs