Assessment Year | 2012 |
---|---|
Principal Product | Door Manufacturing |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $10 M to 50M |
# of Employees | 8 |
Plant Area |
135,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,646 | 573,040 |
kWh
|
$0.099 |
Electricity Demand | $14,004 | 2,823 |
kW-mo/yr
|
$4.96 |
Natural Gas | $40,708 | 4,622 |
MMBtu
|
$8.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,189 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,024 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,461 | $11,250 |
$2,429
24,531
kWh
|
$660
-
kW-mo/yr
|
- | $372 | |
02 | 2.7135: Install occupancy sensors | $3,730 | $10,374 |
$2,927
29,561
kWh
|
$670
-
kW-mo/yr
|
- | $133 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,467 | $6,930 |
$1,092
11,032
kWh
|
$298
-
kW-mo/yr
|
- | $77 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,478 | $9,168 |
$2,661
26,874
kWh
|
$724
-
kW-mo/yr
|
- | $93 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,850 | $1,000 |
$1,453
14,677
kWh
|
$397
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,371 | $375 |
$352
3,560
kWh
|
$2,019
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $653 | $40 |
$514
5,190
kWh
|
$139
-
kW-mo/yr
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $16,963 | $150 |
$12,646
127,733
kWh
|
- |
$4,317
-
MMBtu
|
- | |
09 | 2.2437: Recover waste heat from equipment | $1,214 | $400 | - | - |
$1,214
-
MMBtu
|
- | |
10 | 2.2414: Use waste heat from hot flue gases to preheat | $1,002 | $1,500 | - | - |
$1,002
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $36,189 | $41,187 |
$24,074
243,158
kWh
|
$4,907
-
kW-mo/yr
|
$6,533
-
MMBtu
|
$675 | ||
TOTAL IMPLEMENTED | $3,024 | $415 |
$866
8,750
kWh
|
$2,158
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs