ITAC Assessment: LE0344
ITAC logo
ITAC Assessment: LE0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Door Manufacturing
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 8
Plant Area 135,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,646 573,040
kWh
Electricity Demand $14,004 2,823
kW-mo/yr
Natural Gas $40,708 4,622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,189 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,024

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,461 $11,250 $2,429
24,531
kWh
$660
-
kW-mo/yr
- $372
02 2.7135: Install occupancy sensors $3,730 $10,374 $2,927
29,561
kWh
$670
-
kW-mo/yr
- $133
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,467 $6,930 $1,092
11,032
kWh
$298
-
kW-mo/yr
- $77
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,478 $9,168 $2,661
26,874
kWh
$724
-
kW-mo/yr
- $93
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,850 $1,000 $1,453
14,677
kWh
$397
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,371 $375 $352
3,560
kWh
$2,019
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $653 $40 $514
5,190
kWh
$139
-
kW-mo/yr
- -
08 2.7261: Install timers and/or thermostats $16,963 $150 $12,646
127,733
kWh
- $4,317
-
MMBtu
-
09 2.2437: Recover waste heat from equipment $1,214 $400 - - $1,214
-
MMBtu
-
10 2.2414: Use waste heat from hot flue gases to preheat $1,002 $1,500 - - $1,002
-
MMBtu
-
TOTAL RECOMMENDED $36,189 $41,187 $24,074
243,158
kWh
$4,907
-
kW-mo/yr
$6,533
-
MMBtu
$675
TOTAL IMPLEMENTED $3,024 $415 $866
8,750
kWh
$2,158
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs