ITAC Assessment: WV0543
ITAC logo
ITAC Assessment: WV0543
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Toll processing/ Services for Plastic Manufacturers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 400,000
ft2
Annual Production 60,000,000
units
Production Hrs. Annual 6,422
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,092 2,040,000
kWh
Electricity Demand $68,836 5,262
kW-mo/yr
Natural Gas $11,033 1,947
MMBtu
Waste Disposal Costs
Water Usage $741 110
Tgal
Water Disposal $439 110
Tgal
TOTAL YEARLY COSTS $201,141
RECOMMENDED SAVINGS* $38,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,860 $17,381 $11,916
202,301
kWh
$4,944
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,251 $8,510 $3,884
65,936
kWh
$2,367
-
kW-mo/yr
- - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,081 - - $4,081
-
kW-mo/yr
- - - -
04 2.4157: Establish a predictive maintenance program $3,688 $1,000 $3,075
52,203
kWh
$1,282
-
kW-mo/yr
- - - $(-669.0)
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,262 $839 - - $2,262
-
MMBtu
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,457 $5,365 $1,025
17,397
kWh
$432
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,262 $256 $896
15,220
kWh
$366
-
kW-mo/yr
- - - -
08 3.3131: Use evaporation to concentrate material $988 $1,050 - - - $740
-
Tgal
$438
-
Tgal
$(-190.0)
09 2.4151: Develop a repair/replace policy $755 $542 $610
10,364
kWh
$249
-
kW-mo/yr
- - - $(-104.0)
10 2.4231: Reduce the pressure of compressed air to the minimum required $700 $39 $491
8,338
kWh
$209
-
kW-mo/yr
- - - -
11 2.6232: Install set-back timers $164 $765 - - $164
-
MMBtu
- - -
TOTAL RECOMMENDED $38,468 $35,747 $21,897
371,759
kWh
$13,930
-
kW-mo/yr
$2,426
-
MMBtu
$740
-
Tgal
$438
-
Tgal
$(-963.0)
TOTAL IMPLEMENTED $25,828 $26,728 $17,797
302,159
kWh
$8,135
-
kW-mo/yr
- - - $(-104.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs