Assessment Year | 2017 |
---|---|
Principal Product | Biodiesel |
NAICS | 324110: Petroleum Refineries |
SIC | 2911: Petroleum Refining |
Sales Range | $10 M to 50M |
# of Employees | 17 |
Plant Area |
140,000
ft2
|
Annual Production | 8,000
Tgal
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $407,495 | 2,670,602 |
kWh
|
$0.15 |
Electricity Demand | $37,644 | 8,448 |
kW-mo/yr
|
$4.46 |
Natural Gas | $279,412 | 38,086 |
MMBtu
|
$7.34 |
TOTAL YEARLY COSTS | $724,551 | |||
RECOMMENDED SAVINGS* | $85,563 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,897 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $23,294 | $4,639 |
$23,294
154,429
kWh
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $486 | $86 |
$458
3,036
kWh
|
$28
-
kW-mo/yr
|
- | - | - | |
03 | 2.4323: Use optimum size and capacity equipment | $7,070 | $1,651 |
$6,657
44,135
kWh
|
$413
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,325 | $6,323 |
$14,325
94,968
kWh
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,816 | $6,103 |
$8,816
58,444
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,675 | $28,219 |
$23,621
156,598
kWh
|
$1,954
-
kW-mo/yr
|
- | $1,021 | $79 | |
07 | 2.2511: Insulate bare equipment | $3,828 | $5,423 | - | - |
$3,828
-
MMBtu
|
- | - | |
08 | 2.2511: Insulate bare equipment | $1,069 | $1,882 |
$1,069
7,087
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $85,563 | $54,326 |
$78,240
518,697
kWh
|
$2,395
-
kW-mo/yr
|
$3,828
-
MMBtu
|
$1,021 | $79 | ||
TOTAL IMPLEMENTED | $4,897 | $7,305 |
$1,069
7,087
kWh
|
- |
$3,828
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs