ITAC Assessment: SF0505
ITAC logo
ITAC Assessment: SF0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Biodiesel
NAICS 324110: Petroleum Refineries
SIC 2911: Petroleum Refining
Sales Range $10
M
to 50
M
# of Employees 17
Plant Area 140,000
ft2
Annual Production 8,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,495 2,670,602
kWh
Electricity Demand $37,644 8,448
kW-mo/yr
Natural Gas $279,412 38,086
MMBtu
TOTAL YEARLY COSTS $724,551
RECOMMENDED SAVINGS* $85,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $23,294 $4,639 $23,294
154,429
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $486 $86 $458
3,036
kWh
$28
-
kW-mo/yr
- - -
03 2.4323: Use optimum size and capacity equipment $7,070 $1,651 $6,657
44,135
kWh
$413
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,325 $6,323 $14,325
94,968
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,816 $6,103 $8,816
58,444
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $26,675 $28,219 $23,621
156,598
kWh
$1,954
-
kW-mo/yr
- $1,021 $79
07 2.2511: Insulate bare equipment $3,828 $5,423 - - $3,828
-
MMBtu
- -
08 2.2511: Insulate bare equipment $1,069 $1,882 $1,069
7,087
kWh
- - - -
TOTAL RECOMMENDED $85,563 $54,326 $78,240
518,697
kWh
$2,395
-
kW-mo/yr
$3,828
-
MMBtu
$1,021 $79
TOTAL IMPLEMENTED $4,897 $7,305 $1,069
7,087
kWh
- $3,828
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs