ITAC Assessment: AM0222
ITAC logo
ITAC Assessment: AM0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Aluminum sand castings
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 16,600
ft2
Annual Production 1,456,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,943 1,412,954
kWh
Natural Gas $49,149 15,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $10,970 $1,000 - $10,970
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,300 $1,400 $4,300
-
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,400 $740 $2,400
99,941
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $2,470 - $2,470
20,809
kWh
- -
05 2.7145: Install skylights $1,580 $1,000 $1,580
65,944
kWh
- -
06 2.8123: Pay utility bills on time $722 - - - $722
07 2.2511: Insulate bare equipment $540 $150 - $540
-
MMBtu
-
TOTAL RECOMMENDED $22,982 $4,290 $10,750
186,694
kWh
$11,510
-
MMBtu
$722
TOTAL IMPLEMENTED $20,512 $4,290 $8,280
165,885
kWh
$11,510
-
MMBtu
$722
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs