ITAC Assessment: NV0092
ITAC logo
ITAC Assessment: NV0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Molded Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 140,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $393,845 9,163,247
kWh
Electricity Demand $169,849 31,807
kW-mo/yr
Electricity Fees $19,212 -
Natural Gas $17,559 3,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
01 2.7135: Install occupancy sensors $712 $246 $643
14,947
kWh
$69
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $291 $21 $246
5,569
kWh
$45
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $4,820 $24,919 - - $4,820 -
04 2.4133: Use most efficient type of electric motors $629 $4,180 $537
12,603
kWh
$92
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $769 $200 $769
17,878
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $3,147 $60 $3,147
73,271
kWh
- - -
07 2.2511: Insulate bare equipment $6,347 $716 $5,424
126,026
kWh
$923
-
kW-mo/yr
- -
08 2.2511: Insulate bare equipment $1,493 $566 $1,323
30,774
kWh
$170
-
kW-mo/yr
- -
09 3.4116: Meter recycled water (to reduce sewer charges) $200 $120 - - - $200
-
Tgal
TOTAL RECOMMENDED $18,408 $31,028 $12,089
281,068
kWh
$1,299
-
kW-mo/yr
$4,820 $200
-
Tgal
TOTAL IMPLEMENTED $11,183 $5,177 $10,123
235,347
kWh
$1,060
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs