| Assessment Year | 1982 |
|---|---|
| Principal Product | QUARTZ CRYSTAL OSCILATOR |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 110 |
| Plant Area |
n/a
|
| Annual Production | 20,000,000
pieces
|
| Production Hrs. Annual | 6,048
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $213,372 | 4,400,645 |
kWh
|
$0.048 |
| Natural Gas | $2,681 | 907 |
MMBtu
|
$2.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,121 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,624 | $6,466 |
$11,624
239,742
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $4,812 | $12,000 |
$4,812
99,355
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $118 | $180 |
$118
2,345
kWh
|
- | |
| 04 | 2.6121: Reduce hot water temperature to the minimum required | $332 | - | - |
$332
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $1,235 | $1,050 |
$999
20,516
kWh
|
$236
-
MMBtu
|
|
| TOTAL RECOMMENDED | $18,121 | $19,696 |
$17,553
361,958
kWh
|
$568
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs