ITAC Assessment: KU0040
ITAC logo
ITAC Assessment: KU0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product QUARTZ CRYSTAL OSCILATOR
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,048
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,372 4,400,645
kWh
Natural Gas $2,681 907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,624 $6,466 $11,624
239,742
kWh
-
02 2.2437: Recover waste heat from equipment $4,812 $12,000 $4,812
99,355
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $118 $180 $118
2,345
kWh
-
04 2.6121: Reduce hot water temperature to the minimum required $332 - - $332
-
MMBtu
05 2.2437: Recover waste heat from equipment $1,235 $1,050 $999
20,516
kWh
$236
-
MMBtu
TOTAL RECOMMENDED $18,121 $19,696 $17,553
361,958
kWh
$568
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs