Assessment Year | 2016 |
---|---|
Principal Product | Plastic Pipe |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $1 M to 5M |
# of Employees | 6 |
Plant Area |
40,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,954 | 873,120 |
kWh
|
$0.074 |
Electricity Demand | $35,869 | 4,484 |
kW-mo/yr
|
$8.00 |
Electricity Fees | $300 | - |
|
- |
Natural Gas | $3,080 | 353 |
MMBtu
|
$8.73 |
TOTAL YEARLY COSTS | $104,203 | |||
RECOMMENDED SAVINGS* | $9,361 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,459 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $3,852 | $1,833 |
$2,572
34,754
kWh
|
$1,280
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,370 | $980 |
$914
12,279
kWh
|
$456
-
kW-mo/yr
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,056 | $1,000 | - |
$1,056
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $993 | $125 |
$665
8,934
kWh
|
$328
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $651 | $1,922 |
$435
5,843
kWh
|
$216
-
kW-mo/yr
|
- | - | |
06 | 2.4224: Upgrade controls on compressors | $624 | $1,090 |
$416
5,593
kWh
|
$208
-
kW-mo/yr
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $498 | $585 | - | - |
$498
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $234 | $90 |
$154
2,072
kWh
|
$80
-
kW-mo/yr
|
- | - | |
09 | 2.4151: Develop a repair/replace policy | $83 | $168 |
$117
1,575
kWh
|
$56
-
kW-mo/yr
|
- | $(-90.0) | |
TOTAL RECOMMENDED | $9,361 | $7,793 |
$5,273
71,050
kWh
|
$3,680
-
kW-mo/yr
|
$498
-
MMBtu
|
$(-90.0) | ||
TOTAL IMPLEMENTED | $2,459 | $2,890 |
$1,371
18,424
kWh
|
$680
-
kW-mo/yr
|
$498
-
MMBtu
|
$(-90.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs