ITAC Assessment: WV0527
ITAC logo
ITAC Assessment: WV0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Fabricated Metal
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 61
Plant Area 75,000
ft2
Annual Production 1,200
ton
Production Hrs. Annual 5,516
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,738 1,309,500
kWh
Electricity Demand $34,422 4,305
kW-mo/yr
Natural Gas $28,605 2,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $13,053 $54,000 $7,901
111,601
kWh
$5,152
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,539 $1,100 - - $4,629
-
MMBtu
$(-90.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,268 $2,530 $4,060
57,347
kWh
$208
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $3,255 $6,300 $(-38.0)
(-536)
kWh
- $3,293
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $2,540 $4,500 $2,540
35,878
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,524 $60 $1,220
17,233
kWh
$304
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,189 $283 - - $1,189
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,044 $165 $836
11,801
kWh
$208
-
kW-mo/yr
- -
09 2.4239: Eliminate or reduce compressed air usage $581 $1,275 $469
6,622
kWh
$112
-
kW-mo/yr
- -
10 2.2511: Insulate bare equipment $252 $263 - - $252
-
MMBtu
-
11 2.4151: Develop a repair/replace policy $212 $527 $268
3,785
kWh
$64
-
kW-mo/yr
- $(-120.0)
TOTAL RECOMMENDED $32,457 $71,003 $17,256
243,731
kWh
$6,048
-
kW-mo/yr
$9,363
-
MMBtu
$(-210.0)
TOTAL IMPLEMENTED $12,420 $5,920 $6,853
96,788
kWh
$896
-
kW-mo/yr
$4,881
-
MMBtu
$(-210.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs