ITAC Assessment: CO0183
ITAC logo
ITAC Assessment: CO0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COMPUTER CHIP WAFERS
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 54,000
pieces
Production Hrs. Annual 6,990
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $951,927 25,983,002
kWh
Natural Gas $81,395 22,155
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,042 $3,930 $3,042
83,236
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,300 $5,000 $5,300
145,076
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $2,630 $5,000 $2,630
71,805
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,240 $2,000 - $2,240
-
MMBtu
05 2.2628: Utilize a less expensive cooling method $10,356 $44,000 $18,114
781,946
kWh
$(-7,758.0)
-
MMBtu
TOTAL RECOMMENDED $23,568 $59,930 $29,086
1,082,063
kWh
$(-5,518.0)
-
MMBtu
TOTAL IMPLEMENTED $17,896 $51,000 $23,414
927,022
kWh
$(-5,518.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs