ITAC Assessment: WV0525
ITAC logo
ITAC Assessment: WV0525
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Products of Purchased Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $50
M
to 100
M
# of Employees 192
Plant Area 200,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,043 2,054,317
kWh
Electricity Demand $111,338 7,267
kW-mo/yr
Natural Gas $35,811 4,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,826 $10,031 $5,154
132,145
kWh
$4,672
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,504 $362 $2,884
73,938
kWh
$2,620
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,290 $6,270 $2,778
71,243
kWh
$2,512
-
kW-mo/yr
-
04 2.6232: Install set-back timers $3,716 $4,223 - - $3,716
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $3,568 $1,114 - - $3,568
-
MMBtu
06 2.4224: Upgrade controls on compressors $2,799 $5,000 $1,466
37,585
kWh
$1,333
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $1,575 $4,088 $824
21,138
kWh
$751
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $640 $11 $334
8,568
kWh
$306
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,918 $31,099 $13,440
344,617
kWh
$12,194
-
kW-mo/yr
$7,284
-
MMBtu
TOTAL IMPLEMENTED $22,835 $20,762 $11,974
307,032
kWh
$10,861
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs