| Assessment Year | 2004 |
|---|---|
| Principal Product | Door & Window Frame Parts |
| NAICS | 321911: Wood Window and Door Manufacturing |
| SIC | 2431: Millwork |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
500,000
ft2
|
| Annual Production | 10,200
pieces
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $233,910 | 6,461,600 |
kWh
|
$0.036 |
| Electricity Demand | $69,975 | 237,204 |
kW-mo/yr
|
$0.29 |
| Electricity Fees | $20,026 | - |
|
- |
| Natural Gas | $79,585 | 10,390 |
MMBtu
|
$7.66 |
| LPG | $27,443 | 2,262 |
MMBtu
|
$12.13 |
| Fuel Oil #2 | $5,942 | 660 |
MMBtu
|
$9.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,610 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $7,100 | $2,000 |
$6,600
183,000
kWh
|
$500
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,200 | - |
$3,100
85,000
kWh
|
$100
-
kW-mo/yr
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $8,830 | $885 |
$8,070
223,000
kWh
|
$760
-
kW-mo/yr
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,500 | $4,500 |
$5,500
151,000
kWh
|
- | - | |
| 05 | 2.4112: Install soft-start to eliminate nuisance trips | $2,600 | $2,300 |
$2,600
71,200
kWh
|
- | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $11,000 | $14,620 |
$8,000
219,400
kWh
|
$3,000
-
kW-mo/yr
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $11,770 | $31,500 |
$9,010
249,000
kWh
|
$2,760
-
kW-mo/yr
|
- | |
| 08 | 2.3212: Optimize plant power factor | $4,610 | $14,750 | - | - | $4,610 | |
| TOTAL RECOMMENDED | $54,610 | $70,555 |
$42,880
1,181,600
kWh
|
$7,120
-
kW-mo/yr
|
$4,610 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs