ITAC Assessment: OR0469
ITAC logo
ITAC Assessment: OR0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Door & Window Frame Parts
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 500,000
ft2
Annual Production 10,200
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,910 6,461,600
kWh
Electricity Demand $69,975 237,204
kW-mo/yr
Electricity Fees $20,026 -
Natural Gas $79,585 10,390
MMBtu
LPG $27,443 2,262
MMBtu
Fuel Oil #2 $5,942 660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4224: Upgrade controls on compressors $7,100 $2,000 $6,600
183,000
kWh
$500
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,200 - $3,100
85,000
kWh
$100
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $8,830 $885 $8,070
223,000
kWh
$760
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $5,500 $4,500 $5,500
151,000
kWh
- -
05 2.4112: Install soft-start to eliminate nuisance trips $2,600 $2,300 $2,600
71,200
kWh
- -
06 2.4133: Use most efficient type of electric motors $11,000 $14,620 $8,000
219,400
kWh
$3,000
-
kW-mo/yr
-
07 2.4322: Use or replace with energy efficient substitutes $11,770 $31,500 $9,010
249,000
kWh
$2,760
-
kW-mo/yr
-
08 2.3212: Optimize plant power factor $4,610 $14,750 - - $4,610
TOTAL RECOMMENDED $54,610 $70,555 $42,880
1,181,600
kWh
$7,120
-
kW-mo/yr
$4,610
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs