Assessment Year | 2004 |
---|---|
Principal Product | Door & Window Frame Parts |
NAICS | 321911: Wood Window and Door Manufacturing |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
500,000
ft2
|
Annual Production | 10,200
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,910 | 6,461,600 |
kWh
|
$0.036 |
Electricity Demand | $69,975 | 237,204 |
kW-mo/yr
|
$0.29 |
Electricity Fees | $20,026 | - |
|
- |
Natural Gas | $79,585 | 10,390 |
MMBtu
|
$7.66 |
LPG | $27,443 | 2,262 |
MMBtu
|
$12.13 |
Fuel Oil #2 | $5,942 | 660 |
MMBtu
|
$9.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,610 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $7,100 | $2,000 |
$6,600
183,000
kWh
|
$500
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,200 | - |
$3,100
85,000
kWh
|
$100
-
kW-mo/yr
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $8,830 | $885 |
$8,070
223,000
kWh
|
$760
-
kW-mo/yr
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,500 | $4,500 |
$5,500
151,000
kWh
|
- | - | |
05 | 2.4112: Install soft-start to eliminate nuisance trips | $2,600 | $2,300 |
$2,600
71,200
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $11,000 | $14,620 |
$8,000
219,400
kWh
|
$3,000
-
kW-mo/yr
|
- | |
07 | 2.4322: Use or replace with energy efficient substitutes | $11,770 | $31,500 |
$9,010
249,000
kWh
|
$2,760
-
kW-mo/yr
|
- | |
08 | 2.3212: Optimize plant power factor | $4,610 | $14,750 | - | - | $4,610 | |
TOTAL RECOMMENDED | $54,610 | $70,555 |
$42,880
1,181,600
kWh
|
$7,120
-
kW-mo/yr
|
$4,610 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs