Assessment Year | 2016 |
---|---|
Principal Product | Purchased Glass |
NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
250,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 5,100
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $337,521 | 8,828,952 |
kWh
|
$0.038 |
Electricity Demand | $342,804 | 22,375 |
kW-mo/yr
|
$15.32 |
Natural Gas | $14,632 | 2,208 |
MMBtu
|
$6.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,010 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,329 | $30,168 |
$15,606
408,525
kWh
|
$14,723
-
kW-mo/yr
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $5,145 | $3,264 | - | - |
$5,145
-
MMBtu
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,286 | $65 |
$2,202
57,650
kWh
|
$2,084
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,003 | $305 |
$1,548
40,519
kWh
|
$1,455
-
kW-mo/yr
|
- | - | |
05 | 2.6232: Install set-back timers | $2,321 | $3,148 | - | - |
$2,321
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,139 | $10,151 |
$867
22,706
kWh
|
$1,272
-
kW-mo/yr
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $1,984 | $1,080 |
$1,155
30,229
kWh
|
$1,088
-
kW-mo/yr
|
- | $(-259.0) | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,870 | $756 | - | - |
$1,870
-
MMBtu
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $1,448 | $1,208 |
$743
19,453
kWh
|
$705
-
kW-mo/yr
|
- | - | |
10 | 2.2511: Insulate bare equipment | $269 | $370 |
$269
7,032
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $52,794 | $50,515 |
$22,390
586,114
kWh
|
$21,327
-
kW-mo/yr
|
$9,336
-
MMBtu
|
$(-259.0) | ||
TOTAL IMPLEMENTED | $42,010 | $42,139 |
$21,647
566,661
kWh
|
$20,622
-
kW-mo/yr
|
- | $(-259.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs