Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Purchased Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 250,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,100
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,521 8,828,952
kWh
Electricity Demand $342,804 22,375
kW-mo/yr
Natural Gas $14,632 2,208
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,329 $30,168 $15,606
408,525
kWh
$14,723
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $5,145 $3,264 - - $5,145
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,286 $65 $2,202
57,650
kWh
$2,084
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,003 $305 $1,548
40,519
kWh
$1,455
-
kW-mo/yr
- -
05 2.6232: Install set-back timers $2,321 $3,148 - - $2,321
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,139 $10,151 $867
22,706
kWh
$1,272
-
kW-mo/yr
- -
07 2.4151: Develop a repair/replace policy $1,984 $1,080 $1,155
30,229
kWh
$1,088
-
kW-mo/yr
- $(-259.0)
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,870 $756 - - $1,870
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $1,448 $1,208 $743
19,453
kWh
$705
-
kW-mo/yr
- -
10 2.2511: Insulate bare equipment $269 $370 $269
7,032
kWh
- - -
TOTAL RECOMMENDED $52,794 $50,515 $22,390
586,114
kWh
$21,327
-
kW-mo/yr
$9,336
-
MMBtu
$(-259.0)
TOTAL IMPLEMENTED $42,010 $42,139 $21,647
566,661
kWh
$20,622
-
kW-mo/yr
- $(-259.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs