Assessment Year | 2016 |
---|---|
Principal Product | Products of Purchased Glass |
NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $10 M to 50M |
# of Employees | 91 |
Plant Area |
114,000
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 4,590
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,301 | 1,775,520 |
kWh
|
$0.072 |
Electricity Demand | $73,793 | 9,560 |
kW-mo/yr
|
$7.72 |
Natural Gas | $10,607 | 1,183 |
MMBtu
|
$8.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,423 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,495 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $3,759 | $1,510 |
$1,569
21,883
kWh
|
$440
-
kW-mo/yr
|
- | $1,750 | |
02 | 2.2511: Insulate bare equipment | $3,281 | $6,551 |
$2,563
35,746
kWh
|
$718
-
kW-mo/yr
|
- | - | |
03 | 2.6232: Install set-back timers | $1,381 | $3,265 | - | - |
$1,381
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,154 | $77 |
$899
12,544
kWh
|
$255
-
kW-mo/yr
|
- | - | |
05 | 2.4157: Establish a predictive maintenance program | $996 | $1,000 |
$1,570
21,892
kWh
|
$571
-
kW-mo/yr
|
- | $(-1,145.0) | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $888 | $504 | - | - |
$888
-
MMBtu
|
- | |
07 | 2.7135: Install occupancy sensors | $560 | $467 |
$398
5,548
kWh
|
$162
-
kW-mo/yr
|
- | - | |
08 | 2.4151: Develop a repair/replace policy | $300 | $543 |
$353
4,926
kWh
|
$100
-
kW-mo/yr
|
- | $(-153.0) | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $104 | $106 |
$81
1,130
kWh
|
$23
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $12,423 | $14,023 |
$7,433
103,669
kWh
|
$2,269
-
kW-mo/yr
|
$2,269
-
MMBtu
|
$452 | ||
TOTAL IMPLEMENTED | $4,495 | $5,458 |
$3,301
46,040
kWh
|
$1,111
-
kW-mo/yr
|
$1,381
-
MMBtu
|
$(-1,298.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs