ITAC Assessment: WV0522
ITAC logo
ITAC Assessment: WV0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Products of Purchased Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 114,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,301 1,775,520
kWh
Electricity Demand $73,793 9,560
kW-mo/yr
Natural Gas $10,607 1,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,423 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,495

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4226: Use / purchase optimum sized compressor $3,759 $1,510 $1,569
21,883
kWh
$440
-
kW-mo/yr
- $1,750
02 2.2511: Insulate bare equipment $3,281 $6,551 $2,563
35,746
kWh
$718
-
kW-mo/yr
- -
03 2.6232: Install set-back timers $1,381 $3,265 - - $1,381
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,154 $77 $899
12,544
kWh
$255
-
kW-mo/yr
- -
05 2.4157: Establish a predictive maintenance program $996 $1,000 $1,570
21,892
kWh
$571
-
kW-mo/yr
- $(-1,145.0)
06 2.7447: Install vinyl strip / high speed / air curtain doors $888 $504 - - $888
-
MMBtu
-
07 2.7135: Install occupancy sensors $560 $467 $398
5,548
kWh
$162
-
kW-mo/yr
- -
08 2.4151: Develop a repair/replace policy $300 $543 $353
4,926
kWh
$100
-
kW-mo/yr
- $(-153.0)
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $104 $106 $81
1,130
kWh
$23
-
kW-mo/yr
- -
TOTAL RECOMMENDED $12,423 $14,023 $7,433
103,669
kWh
$2,269
-
kW-mo/yr
$2,269
-
MMBtu
$452
TOTAL IMPLEMENTED $4,495 $5,458 $3,301
46,040
kWh
$1,111
-
kW-mo/yr
$1,381
-
MMBtu
$(-1,298.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs