Assessment Year | 2016 |
---|---|
Principal Product | Adhesive Manufacturing |
NAICS | 325520: Adhesive Manufacturing |
SIC | 2891: Adhesives and Sealants |
Sales Range | $100 M to 500M |
# of Employees | 80 |
Plant Area |
100,000
ft2
|
Annual Production | 8,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $404,771 | 5,034,960 |
kWh
|
$0.080 |
Electricity Demand | $65,774 | 10,130 |
kW-mo/yr
|
$6.49 |
Natural Gas | $121,763 | 28,925 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,161 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,774 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $26,401 | $25,760 | - |
$26,401
-
kW-mo/yr
|
- | - | |
02 | 2.4224: Upgrade controls on compressors | $10,186 | $8,000 |
$10,186
126,686
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,543 | $2,714 |
$4,719
58,688
kWh
|
$824
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,142 | $152 |
$2,830
35,201
kWh
|
$312
-
kW-mo/yr
|
- | - | |
05 | 2.4151: Develop a repair/replace policy | $2,423 | $1,224 |
$2,593
32,251
kWh
|
$286
-
kW-mo/yr
|
- | $(-456.0) | |
06 | 2.2511: Insulate bare equipment | $1,612 | $3,592 | - | - |
$1,612
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $728 | $443 |
$657
8,169
kWh
|
$71
-
kW-mo/yr
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $718 | $500 | - | - |
$775
-
MMBtu
|
$(-57.0) | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $408 | $728 | - | - |
$408
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $51,161 | $43,113 |
$20,985
260,995
kWh
|
$27,894
-
kW-mo/yr
|
$2,795
-
MMBtu
|
$(-513.0) | ||
TOTAL IMPLEMENTED | $14,774 | $9,095 |
$13,673
170,056
kWh
|
$383
-
kW-mo/yr
|
$775
-
MMBtu
|
$(-57.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs