| Assessment Year | 2025 |
|---|---|
| Principal Product | Seals and Gaskets |
| NAICS | 339999: All Other Miscellaneous Manufacturing |
| SIC | 3053: Gaskets, Packing, and Sealing Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 174 |
| Plant Area |
67,000
ft2
|
| Annual Production | 450
units
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $468,760 | 2,688,825 |
kWh
|
$0.17 |
| Electricity Demand | $384,192 | 6,307 |
kW-mo/yr
|
$60.92 |
| TOTAL YEARLY COSTS | $852,952 | |||
| RECOMMENDED SAVINGS* | $746,877 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $418,912 | $524,659 |
$168,897
969,000
kWh
|
$250,016
-
kW-mo/yr
|
- | |
| 02 | 2.3141: Use battery storage for demand control | $260,930 | $10,784 |
$(-9,850.6)
(-56,515)
kWh
|
$270,781
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,190 | $8,318 |
$23,261
133,452
kWh
|
$17,929
-
kW-mo/yr
|
- | |
| 04 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $2,121 | $299 |
$1,307
7,500
kWh
|
$813
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,877 | $3,727 |
$1,919
11,010
kWh
|
$958
-
kW-mo/yr
|
- | |
| 06 | 4.212: Adopt in-house material generation | $17,049 | $46,406 |
$(-4,551.0)
(-26,110)
kWh
|
- | $21,600 | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,797 | - |
$3,797
21,785
kWh
|
- | - | |
| TOTAL RECOMMENDED | $746,877 | $594,193 |
$184,779
1,060,122
kWh
|
$540,497
-
kW-mo/yr
|
$21,600 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs