| Assessment Year | 2016 |
|---|---|
| Principal Product | Metal Stamping |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
155,000
ft2
|
| Annual Production | 20,000,000
pieces
|
| Production Hrs. Annual | 4,940
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $100,566 | 1,995,347 |
kWh
|
$0.050 |
| Electricity Demand | $137,369 | 7,770 |
kW-mo/yr
|
$17.68 |
| Natural Gas | $17,363 | 2,221 |
MMBtu
|
$7.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,366 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,234 | $120,094 |
$17,400
345,247
kWh
|
$14,834
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,194 | $11,813 |
$2,267
44,982
kWh
|
$1,927
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,037 | $370 |
$2,181
43,265
kWh
|
$1,856
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,924 | $1,187 | - | - | - |
$1,924
-
MMBtu
|
- | |
| 05 | 2.3212: Optimize plant power factor | $1,776 | $5,830 | - | - | $1,776 | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,809 | $1,589 |
$960
19,047
kWh
|
$849
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4151: Develop a repair/replace policy | $780 | $1,156 |
$639
12,672
kWh
|
$548
-
kW-mo/yr
|
- | - | $(-407.0) | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $773 | $1,420 |
$419
8,316
kWh
|
$354
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.4239: Eliminate or reduce compressed air usage | $461 | $428 |
$249
4,932
kWh
|
$212
-
kW-mo/yr
|
- | - | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $279 | $384 |
$191
3,785
kWh
|
$88
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $48,267 | $144,271 |
$24,306
482,246
kWh
|
$20,668
-
kW-mo/yr
|
$1,776 |
$1,924
-
MMBtu
|
$(-407.0) | ||
| TOTAL IMPLEMENTED | $7,366 | $3,927 |
$4,220
83,701
kWh
|
$3,553
-
kW-mo/yr
|
- | - | $(-407.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs