Assessment Year | 1998 |
---|---|
Principal Product | Corrugated Containers |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
200,000
ft2
|
Annual Production | 630,000
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,530 | 3,670,281 |
kWh
|
$0.060 |
Electricity Demand | $114,008 | 8,857 |
kW-mo/yr
|
$12.87 |
Natural Gas | $94,132 | 35,039 |
MMBtu
|
$2.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $493,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $451,926 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2114: Shut off steam traps on super heated steam lines when not in use | $1,548 | $488 | - | - | - |
$1,548
-
MMBtu
|
- | - | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $4,201 | - |
$3,588
59,496
kWh
|
$613
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $20,620 | $2,065 |
$15,369
254,689
kWh
|
$5,251
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,354 | $1,650 |
$1,004
16,706
kWh
|
$350
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,412 | $26,680 |
$9,371
155,334
kWh
|
$4,041
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.3212: Optimize plant power factor | $2,725 | $4,531 | - | - | $2,725 | - | - | - | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $411 | $1,358 |
$508
8,499
kWh
|
- | - |
$(-97.0)
-
MMBtu
|
- | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $4,006 | - | - | - | - | - |
$4,006
-
lb
|
- | |
09 | 3.1192: Reduce scrap production | $3,456 | $1,000 | - | - | - | - |
$3,456
-
lb
|
- | |
10 | 3.1192: Reduce scrap production | $3,906 | $15,400 | - | - | - | - |
$3,906
-
lb
|
- | |
11 | 4.445: Install equipment to move product | $438,048 | $100,000 | - | - | - | - | - | $438,048 | |
TOTAL RECOMMENDED | $493,687 | $153,172 |
$29,840
494,724
kWh
|
$10,255
-
kW-mo/yr
|
$2,725 |
$1,451
-
MMBtu
|
$11,368
-
lb
|
$438,048 | ||
TOTAL IMPLEMENTED | $451,926 | $118,408 |
$5,100
84,701
kWh
|
$963
-
kW-mo/yr
|
- |
$(-97.0)
-
MMBtu
|
$7,912
-
lb
|
$438,048 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs