ITAC Assessment: SF0132
ITAC logo
ITAC Assessment: SF0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 200,000
ft2
Annual Production 630,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,530 3,670,281
kWh
Electricity Demand $114,008 8,857
kW-mo/yr
Natural Gas $94,132 35,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $493,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $451,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2114: Shut off steam traps on super heated steam lines when not in use $1,548 $488 - - - $1,548
-
MMBtu
- -
02 2.4235: Remove or close off unneeded compressed air lines $4,201 - $3,588
59,496
kWh
$613
-
kW-mo/yr
- - - -
03 2.6231: Utilize controls to operate equipment only when needed $20,620 $2,065 $15,369
254,689
kWh
$5,251
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $1,354 $1,650 $1,004
16,706
kWh
$350
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,412 $26,680 $9,371
155,334
kWh
$4,041
-
kW-mo/yr
- - - -
06 2.3212: Optimize plant power factor $2,725 $4,531 - - $2,725 - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $411 $1,358 $508
8,499
kWh
- - $(-97.0)
-
MMBtu
- -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $4,006 - - - - - $4,006
-
lb
-
09 3.1192: Reduce scrap production $3,456 $1,000 - - - - $3,456
-
lb
-
10 3.1192: Reduce scrap production $3,906 $15,400 - - - - $3,906
-
lb
-
11 4.445: Install equipment to move product $438,048 $100,000 - - - - - $438,048
TOTAL RECOMMENDED $493,687 $153,172 $29,840
494,724
kWh
$10,255
-
kW-mo/yr
$2,725 $1,451
-
MMBtu
$11,368
-
lb
$438,048
TOTAL IMPLEMENTED $451,926 $118,408 $5,100
84,701
kWh
$963
-
kW-mo/yr
- $(-97.0)
-
MMBtu
$7,912
-
lb
$438,048
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs