ITAC Assessment: WV0497
ITAC logo
ITAC Assessment: WV0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Spark Plugs and O2 Sensors
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $100
M
to 500
M
# of Employees 540
Plant Area 302,665
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $441,462 10,529,750
kWh
Electricity Demand $247,071 21,872
kW-mo/yr
Electricity Fees $4,500 -
Natural Gas $87,362 12,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4224: Upgrade controls on compressors $27,086 $24,525 $20,163
480,869
kWh
$6,923
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,552 $4,210 $13,535
322,802
kWh
$7,017
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $9,773 $3,008 $6,439
153,568
kWh
$3,334
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,054 $4,016 $5,105
121,829
kWh
$2,949
-
kW-mo/yr
- -
05 2.4157: Establish a predictive maintenance program $6,086 $1,000 $5,474
130,549
kWh
$2,836
-
kW-mo/yr
- $(-2,224.0)
06 2.4151: Develop a repair/replace policy $2,304 $567 $1,847
44,060
kWh
$961
-
kW-mo/yr
- $(-504.0)
07 2.6232: Install set-back timers $2,208 $918 - - $2,208
-
MMBtu
-
08 2.2437: Recover waste heat from equipment $1,824 $404 - - $1,824
-
MMBtu
-
09 2.7135: Install occupancy sensors $1,207 $186 $795
18,950
kWh
$412
-
kW-mo/yr
- -
10 2.4239: Eliminate or reduce compressed air usage $340 $192 $227
5,408
kWh
$113
-
kW-mo/yr
- -
TOTAL RECOMMENDED $79,434 $39,026 $53,585
1,278,035
kWh
$24,545
-
kW-mo/yr
$4,032
-
MMBtu
$(-2,728.0)
TOTAL IMPLEMENTED $26,557 $8,783 $19,092
455,414
kWh
$10,193
-
kW-mo/yr
- $(-2,728.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs