Assessment Year | 1986 |
---|---|
Principal Product | CUSTOM MADE ENVELOPES |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 187 |
Plant Area |
n/a
|
Annual Production | 42,000,000
lb
|
Production Hrs. Annual | 4,775
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,247 | 2,642,732 |
kWh
|
$0.092 |
LPG | $39,424 | 4,192 |
MMBtu
|
$9.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,908 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,816 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,477 | $90 |
$3,477
37,808
kWh
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $175 | - |
$175
2,052
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $11,835 | $6,500 | - |
$11,835
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,016 | $1,157 |
$2,016
21,981
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,821 | $381 |
$1,821
19,637
kWh
|
- | |
06 | 2.6121: Reduce hot water temperature to the minimum required | $1,144 | - |
$1,144
12,309
kWh
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,265 | $5,000 |
$2,244
24,326
kWh
|
$(-979.0)
-
MMBtu
|
|
08 | 2.7224: Reduce space conditioning during non-working hours | $9,004 | - | - |
$9,004
-
MMBtu
|
|
09 | 2.7221: Lower temperature during the winter season and vice-versa | $3,865 | - | - |
$3,865
-
MMBtu
|
|
10 | 2.1123: Install automatic stack damper | $2,306 | $3,000 | - |
$2,306
-
MMBtu
|
|
TOTAL RECOMMENDED | $36,908 | $16,128 |
$10,877
118,113
kWh
|
$26,031
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,816 | $1,247 |
$6,812
74,150
kWh
|
$9,004
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs