ITAC Assessment: WV0475
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product entertainment services
NAICS 721120: Casino Hotels
SIC 7011: Hotels and Motels
Sales Range $50
M
to 100
M
# of Employees 1,600
Plant Area 563,897
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,188,604 29,585,456
kWh
Electricity Demand $547,637 55,517
kW-mo/yr
Natural Gas $275,278 42,189
MMBtu
Other Gas $295,895 9,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $261,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $80,805 $74,600 $21,284
529,460
kWh
- $59,521
-
MMBtu
- - -
02 2.7496: Install partitions to reduce size of conditioned space $62,278 $279,714 $15,237
379,023
kWh
$5,443
-
kW-mo/yr
$41,598
-
MMBtu
- - -
03 2.3191: Use demand controller or load shedder $29,974 $21,000 - $29,974
-
kW-mo/yr
- - - -
04 2.8122: Use utility controlled power management $22,626 $5,000 - - - - $(-33,624.0) $56,250
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,150 $16,076 $9,812
244,091
kWh
$4,338
-
kW-mo/yr
- - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $13,965 $1,700 - - $10,595
-
MMBtu
$4,720
-
MMBtu
$(-1,350.0) -
07 2.2222: Convert liquid heaters from underfiring to immersion or submersion heating $13,558 $23,000 $(-14,790.0)
(-367,920)
kWh
$(-4,969.0)
-
kW-mo/yr
- $33,317
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $9,352 $13,858 $6,838
170,109
kWh
$2,514
-
kW-mo/yr
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,383 $7,846 $2,535
63,072
kWh
$848
-
kW-mo/yr
- - - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,008 - $1,519
37,796
kWh
$1,489
-
kW-mo/yr
- - - -
11 2.7243: Improve air circulation with destratification fans / other methods $2,308 $8,400 - - $2,308
-
MMBtu
- - -
12 2.7261: Install timers and/or thermostats $2,071 $750 $1,548
38,500
kWh
$523
-
kW-mo/yr
- - - -
13 2.7447: Install vinyl strip / high speed / air curtain doors $1,869 $1,152 - - $130
-
MMBtu
$1,739
-
MMBtu
- -
14 2.2136: Install / repair insulation on steam lines $1,243 $1,168 - - $346
-
MMBtu
$897
-
MMBtu
- -
15 2.4157: Establish a predictive maintenance program $715 $1,000 $1,183
29,423
kWh
$1,065
-
kW-mo/yr
- - $(-1,533.0) -
16 2.4151: Develop a repair/replace policy $260 $160 $177
4,413
kWh
$158
-
kW-mo/yr
- - $(-75.0) -
TOTAL RECOMMENDED $261,565 $455,424 $45,343
1,127,967
kWh
$41,383
-
kW-mo/yr
$114,498
-
MMBtu
$40,673
-
MMBtu
$(-36,582.0) $56,250
TOTAL IMPLEMENTED $70,424 $46,382 $22,252
553,568
kWh
$9,712
-
kW-mo/yr
$10,725
-
MMBtu
$6,459
-
MMBtu
$(-34,974.0) $56,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs