Assessment Year | 2013 |
---|---|
Principal Product | polyethylene pipes |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
82,840
ft2
|
Annual Production | 40,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $603,950 | 14,465,075 |
kWh
|
$0.042 |
Electricity Demand | $327,515 | 24,652 |
kW-mo/yr
|
$13.29 |
Electricity Fees | $4,595 | - |
|
- |
Natural Gas | $33,173 | 3,476 |
MMBtu
|
$9.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,227 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,330 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $17,183 | - |
$11,951
285,916
kWh
|
$5,232
-
kW-mo/yr
|
- | - | |
02 | 2.4156: Establish a preventative maintenance program | $14,224 | $1,000 |
$9,971
238,548
kWh
|
$4,346
-
kW-mo/yr
|
- | $(-93.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,833 | $27,115 |
$5,454
130,489
kWh
|
$2,379
-
kW-mo/yr
|
- | - | |
04 | 2.4151: Develop a repair/replace policy | $7,221 | $553 |
$5,107
122,173
kWh
|
$2,219
-
kW-mo/yr
|
- | $(-105.0) | |
05 | 2.2437: Recover waste heat from equipment | $6,230 | $2,734 | - | - |
$6,230
-
MMBtu
|
- | |
06 | 2.7261: Install timers and/or thermostats | $2,480 | $2,088 | - | - |
$2,480
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,232 | $18 |
$1,554
37,186
kWh
|
$678
-
kW-mo/yr
|
- | - | |
08 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,354 | $6,500 |
$942
22,539
kWh
|
$412
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $936 | $10,030 |
$497
11,900
kWh
|
$439
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $797 | $1,725 |
$305
7,287
kWh
|
$492
-
kW-mo/yr
|
- | - | |
11 | 2.4239: Eliminate or reduce compressed air usage | $737 | $829 |
$511
12,229
kWh
|
$226
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $61,227 | $52,592 |
$36,292
868,267
kWh
|
$16,423
-
kW-mo/yr
|
$8,710
-
MMBtu
|
$(-198.0) | ||
TOTAL IMPLEMENTED | $43,330 | $14,155 |
$29,896
715,239
kWh
|
$13,632
-
kW-mo/yr
|
- | $(-198.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs