Assessment Year | 2012 |
---|---|
Principal Product | MICR toner and ribbons for printers |
NAICS | 339940: Office Supplies (except Paper) Manufacturing |
SIC | 3955: Carbon Paper and Inked Ribbons |
Sales Range | $10 M to 50M |
# of Employees | 98 |
Plant Area |
88,000
ft2
|
Annual Production | 830,000
lb
|
Production Hrs. Annual | 3,952
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $210,901 | 3,143,735 |
kWh
|
$0.067 |
Electricity Demand | $66,569 | 10,801 |
kW-mo/yr
|
$6.16 |
Electricity Fees | $7,025 | - |
|
- |
Natural Gas | $46,865 | 5,111 |
MMBtu
|
$9.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,933 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,738 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $9,142 | $3,345 | - | - |
$9,142
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,722 | $23,208 |
$6,250
93,165
kWh
|
$1,472
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,929 | $13,233 |
$5,303
79,040
kWh
|
$1,626
-
kW-mo/yr
|
- | - | |
04 | 2.4156: Establish a preventative maintenance program | $3,821 | $1,000 |
$3,128
46,617
kWh
|
$875
-
kW-mo/yr
|
- | $(-182.0) | |
05 | 2.4314: Use synthetic lubricant | $3,043 | $500 |
$2,378
35,449
kWh
|
$665
-
kW-mo/yr
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $2,472 | $4,330 |
$(-68.0)
(-1,014)
kWh
|
$(-18.0)
-
kW-mo/yr
|
$2,558
-
MMBtu
|
- | |
07 | 2.4151: Develop a repair/replace policy | $2,133 | $637 |
$2,058
30,678
kWh
|
$579
-
kW-mo/yr
|
- | $(-504.0) | |
08 | 2.7261: Install timers and/or thermostats | $1,302 | $605 | - | - |
$1,302
-
MMBtu
|
- | |
09 | 2.7241: Install outside air damper / economizer on hvac unit | $1,258 | $1,084 |
$1,258
18,752
kWh
|
- | - | - | |
10 | 2.4239: Eliminate or reduce compressed air usage | $808 | $1,242 |
$808
12,047
kWh
|
- | - | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $803 | $1,484 |
$628
9,366
kWh
|
$175
-
kW-mo/yr
|
- | - | |
12 | 2.2414: Use waste heat from hot flue gases to preheat | $734 | $1,630 | - | - |
$734
-
MMBtu
|
- | |
13 | 2.2122: Install / repair insulation on condensate lines | $633 | $771 | - | - |
$633
-
MMBtu
|
- | |
14 | 2.1233: Analyze flue gas for proper air/fuel ratio | $133 | $500 | - | - |
$165
-
MMBtu
|
$(-32.0) | |
TOTAL RECOMMENDED | $40,933 | $53,569 |
$21,743
324,100
kWh
|
$5,374
-
kW-mo/yr
|
$14,534
-
MMBtu
|
$(-718.0) | ||
TOTAL IMPLEMENTED | $20,738 | $38,578 |
$16,739
249,500
kWh
|
$4,552
-
kW-mo/yr
|
$165
-
MMBtu
|
$(-718.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs