Assessment Year | 2008 |
---|---|
Principal Product | Carbonated and non carbonated beverages |
NAICS | 311930: Flavoring Syrup and Concentrate Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
230,000
ft2
|
Annual Production | 3,000,000
units
|
Production Hrs. Annual | 7,248
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $331,374 | 7,359,740 |
kWh
|
$0.045 |
Electricity Demand | $117,607 | 17,044 |
kW-mo/yr
|
$6.90 |
Electricity Fees | $3,223 | - |
|
- |
Natural Gas | $654,056 | 73,795 |
MMBtu
|
$8.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,080 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $21,957 | $5,000 | - | - |
$22,020
-
MMBtu
|
$(-63.0) | |
02 | 2.1213: Direct warmest air to combustion intake | $14,777 | $18,980 | - | - |
$14,777
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,568 | $25,978 |
$11,622
258,091
kWh
|
$2,946
-
kW-mo/yr
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $9,122 | $231 | - | - |
$9,122
-
MMBtu
|
- | |
05 | 2.4157: Establish a predictive maintenance program | $6,506 | $1,000 |
$5,743
127,527
kWh
|
$973
-
kW-mo/yr
|
- | $(-210.0) | |
06 | 2.4151: Develop a repair/replace policy | $5,730 | $815 |
$4,669
103,680
kWh
|
$1,187
-
kW-mo/yr
|
- | $(-126.0) | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $4,754 | $3,084 |
$4,064
90,244
kWh
|
$690
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,670 | - |
$2,928
65,015
kWh
|
$742
-
kW-mo/yr
|
- | - | |
09 | 2.4224: Upgrade controls on compressors | $2,273 | $1,830 |
$1,942
43,126
kWh
|
$331
-
kW-mo/yr
|
- | - | |
10 | 2.2628: Utilize a less expensive cooling method | $1,858 | $7,053 |
$2,793
62,024
kWh
|
$815
-
kW-mo/yr
|
- | $(-1,750.0) | |
11 | 2.2511: Insulate bare equipment | $1,335 | $710 | - | - |
$1,335
-
MMBtu
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,192 | $1,202 |
$950
31,026
kWh
|
$242
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $87,742 | $65,883 |
$34,711
780,733
kWh
|
$7,926
-
kW-mo/yr
|
$47,254
-
MMBtu
|
$(-2,149.0) | ||
TOTAL IMPLEMENTED | $64,080 | $34,936 |
$25,912
585,339
kWh
|
$6,090
-
kW-mo/yr
|
$32,477
-
MMBtu
|
$(-399.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs