ITAC Assessment: UD0422
ITAC logo
ITAC Assessment: UD0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product steel castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 2,400
ton
Production Hrs. Annual 2,880
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,202 3,446,366
kWh
Natural Gas $111,452 22,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $2,520 $8,000 $2,520
-
kWh
- - -
02 2.8113: Purchase gas directly from a contract gas supplier $20,950 $5,000 - - - $20,950
03 2.1332: Convert combustion equipment to burn natural gas $1,812 $6,000 - $(-1,428.0)
-
MMBtu
$3,240
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $691 $3,827 $691
20,516
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $21,513 $47,000 $18,861
349,062
kWh
$2,652
-
MMBtu
- -
TOTAL RECOMMENDED $47,486 $69,827 $22,072
369,578
kWh
$1,224
-
MMBtu
$3,240
-
MMBtu
$20,950
TOTAL IMPLEMENTED $47,486 $69,827 $22,072
369,578
kWh
$1,224
-
MMBtu
$3,240
-
MMBtu
$20,950
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs