ITAC Assessment: WV0357
ITAC logo
ITAC Assessment: WV0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product contract injection molded components
NAICS 333511: Industrial Mold Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area 37,500
ft2
Annual Production 1,800,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,756 2,354,080
kWh
Natural Gas $10,369 731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,751 $30,100 $15,751
178,480
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,371 $12,336 $5,371
60,857
kWh
-
03 2.2511: Insulate bare equipment $4,383 $1,405 $4,383
49,810
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,910 $2,990 $2,910
32,978
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $2,672 $5,600 $2,672
30,272
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $1,725 $625 $1,725
19,546
kWh
-
07 2.2628: Utilize a less expensive cooling method $1,629 $1,601 $1,629
18,459
kWh
-
08 2.2628: Utilize a less expensive cooling method $1,455 $2,800 $1,455
16,481
kWh
-
09 2.4151: Develop a repair/replace policy $1,019 $175 $1,319
14,943
kWh
$(-300.0)
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $656 $130 $656
7,430
kWh
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $630 - $630
7,176
kWh
-
12 2.4221: Install compressor air intakes in coolest locations $581 $125 $581
6,585
kWh
-
13 2.4231: Reduce the pressure of compressed air to the minimum required $546 $25 $546
6,186
kWh
-
TOTAL RECOMMENDED $39,328 $57,912 $39,628
449,203
kWh
$(-300.0)
TOTAL IMPLEMENTED $8,814 $3,461 $9,114
103,413
kWh
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs