ITAC Assessment: LM0119
ITAC logo
ITAC Assessment: LM0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product in fact, it
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 3,200
Plant Area 1,500,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,628,386 56,326,250
kWh
Natural Gas $569,438 95,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,475,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,375,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $500 $374 $500
6,085
kWh
-
02 2.4226: Use / purchase optimum sized compressor $746 - $746
9,083
kWh
-
03 2.2511: Insulate bare equipment $859 $100 - $859
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $58,500 $160,200 $58,500
712,000
kWh
-
05 4.512: Condense operation into one building $39,440 - $39,440
480,000
kWh
-
06 4.512: Condense operation into one building $3,375,000 $500,000 $3,375,000
41,070,000
kWh
-
TOTAL RECOMMENDED $3,475,045 $660,674 $3,474,186
42,277,168
kWh
$859
-
MMBtu
TOTAL IMPLEMENTED $3,375,000 $500,000 $3,375,000
41,070,000
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs