Assessment Year | 1996 |
---|---|
Principal Product | Sanitairyware |
NAICS |
n/a
|
SIC | 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
425,212
ft2
|
Annual Production | 1,300,000
pieces
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $246,214 | 6,674,385 |
kWh
|
$0.037 |
Electricity Demand | $135,862 | 14,436 |
kW-mo/yr
|
$9.41 |
Electricity Fees | $51,493 | - |
|
- |
Natural Gas | $678,805 | 251,313 |
MMBtu
|
$2.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $230,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $15,283 | $2,760 | - | - |
$16,213
-
MMBtu
|
$(-930.0) | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $12,354 | $18,480 |
$9,604
283,411
kWh
|
$2,750
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,836 | $7,312 |
$1,943
57,444
kWh
|
$1,893
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,279 | $1,000 |
$1,419
41,911
kWh
|
$860
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,719 | $1,103 |
$1,336
39,273
kWh
|
$383
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $1,671 | $2,175 |
$788
23,154
kWh
|
$883
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $166,575 | $30,700 | - | - | - | - | $166,575 | - | |
08 | 3.4115: Recover and reuse cooling water | $26,766 | $19,320 |
$(-1,050.0)
(-31,067)
kWh
|
$(-514.0)
-
kW-mo/yr
|
- | - | - |
$28,330
-
Tgal
|
|
TOTAL RECOMMENDED | $230,483 | $82,850 |
$14,040
414,126
kWh
|
$6,255
-
kW-mo/yr
|
$16,213
-
MMBtu
|
$(-930.0) | $166,575 |
$28,330
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||