ITAC Assessment: LT8378
ITAC logo
ITAC Assessment: LT8378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hotel
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range $500
k
to 1
M
# of Employees 15
Plant Area 86,689
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,732 976,006
kWh
Electricity Fees $1,166 -
Natural Gas $11,291 1,236
MMBtu
Waste Disposal Costs
Water Usage $6,234 1,971
Tgal
TOTAL YEARLY COSTS $150,423
RECOMMENDED SAVINGS* $29,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $11,552 $30,450 $11,552
85,570
kWh
-
02 2.2314: Replace heat treating oven with more efficient unit $3,145 $2,591 $3,145
23,293
kWh
-
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $11,415 - $6,782
50,241
kWh
$4,633
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $869 $864 $869
6,440
kWh
-
05 2.7135: Install occupancy sensors $2,353 $10,050 $2,353
17,427
kWh
-
TOTAL RECOMMENDED $29,334 $43,955 $24,701
182,971
kWh
$4,633
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs