ITAC Assessment: WV0356
ITAC logo
ITAC Assessment: WV0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Metal forming presses
NAICS 333517: Machine Tool Manufacturing
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 161,851
ft2
Annual Production 100
pieces
Production Hrs. Annual 2,574
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,276 1,395,366
kWh
Electricity Demand $48,885 5,019
kW-mo/yr
Electricity Fees $1,860 -
Natural Gas $137,044 11,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,825 $33,400 $5,679
143,344
kWh
$4,146
-
kW-mo/yr
- -
02 2.7444: Close holes and openings in building such as broken windows $6,101 $16,300 - - $6,101
-
MMBtu
-
03 2.7234: Use heat pump for space conditioning $5,326 $9,600 - - $5,326
-
MMBtu
-
04 3.6124: Burn waste oil for heat $4,096 $3,400 - - $4,096
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,275 - - $4,675
-
kW-mo/yr
- $(-2,400.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,880 - $877
22,142
kWh
$1,003
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $1,349 $1,000 $765
19,305
kWh
$584
-
kW-mo/yr
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,061 $1,000 - - $1,181
-
MMBtu
$(-120.0)
09 2.7221: Lower temperature during the winter season and vice-versa $942 $1,100 $302
7,681
kWh
- $640
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $855 $1,900 $397
10,027
kWh
$458
-
kW-mo/yr
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $715 $350 $403
10,177
kWh
$312
-
kW-mo/yr
- -
12 2.7241: Install outside air damper / economizer on hvac unit $697 $1,080 $697
17,580
kWh
- - -
13 2.4221: Install compressor air intakes in coolest locations $674 $155 $382
9,678
kWh
$292
-
kW-mo/yr
- -
14 2.2437: Recover waste heat from equipment $587 $500 - - $587
-
MMBtu
-
15 2.4151: Develop a repair/replace policy $504 $270 $293
7,325
kWh
$331
-
kW-mo/yr
- $(-120.0)
16 2.4235: Remove or close off unneeded compressed air lines $499 $280 $499
12,564
kWh
- - -
17 2.4231: Reduce the pressure of compressed air to the minimum required $488 $40 $274
6,918
kWh
$214
-
kW-mo/yr
- -
TOTAL RECOMMENDED $37,874 $70,375 $10,568
266,741
kWh
$12,015
-
kW-mo/yr
$17,931
-
MMBtu
$(-2,640.0)
TOTAL IMPLEMENTED $11,814 $14,240 $3,706
93,474
kWh
$2,902
-
kW-mo/yr
$5,326
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs