ITAC Assessment: WV0314
ITAC logo
ITAC Assessment: WV0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Industrial Facings
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 135,000
ft2
Annual Production 750,000
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,680 2,776,863
kWh
Electricity Demand $66,106 10,047
kW-mo/yr
Electricity Fees $11,494 -
Natural Gas $87,815 9,138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,158

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $14,732 $3,713 - - $14,732
-
MMBtu
-
02 2.6241: Reduce temperature of process equipment when on standby $14,277 $70 $16,517
210,240
kWh
- - $(-2,240.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,828 - $4,144
52,992
kWh
$684
-
kW-mo/yr
- -
04 2.7492: Use proper thickness of insulation on building envelope $4,156 $9,591 - - $4,156
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,404 $5,877 $2,924
37,227
kWh
$480
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,829 $605 $1,571
19,997
kWh
$258
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $1,552 $404 $1,335
16,994
kWh
$217
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $534 $105 $458
5,841
kWh
$76
-
kW-mo/yr
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $461 $138 - - $461
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $426 $358 $366
4,655
kWh
$60
-
kW-mo/yr
- -
11 2.4151: Develop a repair/replace policy $406 $96 $1,070
13,478
kWh
$176
-
kW-mo/yr
- $(-840.0)
12 2.4221: Install compressor air intakes in coolest locations $217 $215 $186
2,385
kWh
$31
-
kW-mo/yr
- -
13 4.512: Condense operation into one building $44,003 $60,000 $6,791
86,400
kWh
$1,112
-
kW-mo/yr
$36,100
-
MMBtu
-
TOTAL RECOMMENDED $90,825 $81,172 $35,362
450,209
kWh
$3,094
-
kW-mo/yr
$55,449
-
MMBtu
$(-3,080.0)
TOTAL IMPLEMENTED $38,158 $4,993 $25,095
319,542
kWh
$1,411
-
kW-mo/yr
$14,732
-
MMBtu
$(-3,080.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs