Assessment Year | 2005 |
---|---|
Principal Product | Industrial Facings |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
135,000
ft2
|
Annual Production | 750,000
thousand feet
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,680 | 2,776,863 |
kWh
|
$0.074 |
Electricity Demand | $66,106 | 10,047 |
kW-mo/yr
|
$6.58 |
Electricity Fees | $11,494 | - |
|
- |
Natural Gas | $87,815 | 9,138 |
MMBtu
|
$9.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,158 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $14,732 | $3,713 | - | - |
$14,732
-
MMBtu
|
- | |
02 | 2.6241: Reduce temperature of process equipment when on standby | $14,277 | $70 |
$16,517
210,240
kWh
|
- | - | $(-2,240.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,828 | - |
$4,144
52,992
kWh
|
$684
-
kW-mo/yr
|
- | - | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $4,156 | $9,591 | - | - |
$4,156
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,404 | $5,877 |
$2,924
37,227
kWh
|
$480
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,829 | $605 |
$1,571
19,997
kWh
|
$258
-
kW-mo/yr
|
- | - | |
07 | 2.2511: Insulate bare equipment | $1,552 | $404 |
$1,335
16,994
kWh
|
$217
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $534 | $105 |
$458
5,841
kWh
|
$76
-
kW-mo/yr
|
- | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $461 | $138 | - | - |
$461
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $426 | $358 |
$366
4,655
kWh
|
$60
-
kW-mo/yr
|
- | - | |
11 | 2.4151: Develop a repair/replace policy | $406 | $96 |
$1,070
13,478
kWh
|
$176
-
kW-mo/yr
|
- | $(-840.0) | |
12 | 2.4221: Install compressor air intakes in coolest locations | $217 | $215 |
$186
2,385
kWh
|
$31
-
kW-mo/yr
|
- | - | |
13 | 4.512: Condense operation into one building | $44,003 | $60,000 |
$6,791
86,400
kWh
|
$1,112
-
kW-mo/yr
|
$36,100
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $90,825 | $81,172 |
$35,362
450,209
kWh
|
$3,094
-
kW-mo/yr
|
$55,449
-
MMBtu
|
$(-3,080.0) | ||
TOTAL IMPLEMENTED | $38,158 | $4,993 |
$25,095
319,542
kWh
|
$1,411
-
kW-mo/yr
|
$14,732
-
MMBtu
|
$(-3,080.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs