ITAC Assessment: WV0062
ITAC logo
ITAC Assessment: WV0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Injection-molded Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 93
Plant Area 130,480
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,617 2,723,329
kWh
Natural Gas $39,710 7,804
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,961

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1213: Direct warmest air to combustion intake $12,196 $2,330 - $12,196
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $4,611 $5,068 $4,611
120,457
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $469 $800 - $469
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $296 - $296
7,620
kWh
-
TOTAL RECOMMENDED $17,572 $8,198 $4,907
128,077
kWh
$12,665
-
MMBtu
TOTAL IMPLEMENTED $12,961 $3,130 $296
7,620
kWh
$12,665
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs